Switch to e-Track

Migration and Integration Made Easy

Move on from an ageing or unsupported key management system with a fully managed migration designed around your organisation, locations and operational requirements.

migration-image

A Straightforward Move to a Smarter System

Replacing a legacy system can feel like a complex undertaking. Questions around data migration, installation, staff training and operational disruption can make organisations hesitant to change. e-Track manages every stage of the transition. From understanding your existing setup and preparing your data to installation, onboarding and ongoing support, our team ensures your migration is carefully planned and professionally delivered.

migration-secondary-image

Is Your Current System Holding You Back?

Switching to e-Track gives you a modern, supported and scalable platform designed to improve visibility, control and accountability.

Ageing Hardware

Older cabinets can become increasingly difficult and expensive to maintain.

Limited Support

Discontinued systems and unavailable replacement parts can leave operations exposed when something goes wrong.

Restricted Visibility

Legacy software may provide limited reporting, remote access or multi-site oversight.

Disconnected Processes

Manual records and isolated systems make it harder to maintain control across an organisation.

How the Switch to e-Track Works

Every migration is planned around your existing systems, operational requirements and locations.

1. Discovery

We begin by understanding your existing system, the number of keys or assets being managed, your locations, users and day-to-day requirements.

2. Site Survey

Our team assesses each location and recommends the most suitable hardware, software and installation approach.

3. Data Preparation

We'll extract and prepare the data from your existing system in preparation for go-live to ensure data continuity.

How the Switch to e-Track Works

4. Installation & Configuration

e-Track manages cabinet installation, system configuration and, where agreed, the removal of existing hardware.

5. Staff Onboarding

An e-Track specialist delivers user training during deployment, supported by comprehensive user guides and documentation.

6. Sign-Off & Support

We complete a structured project sign-off and remain available through your account manager, technical helpdesk and chosen support package.

Every Part of Your Migration, Managed

The exact migration plan will depend on your current system, the accessibility and condition of its data, and the requirements of each location.

Surveys and project planning

Data migration support

Legacy hardware removal

Staff training and onboarding

Responsible Removal of Your Old System

We can manage the safe decommissioning, data destruction and sustainable disposal of your legacy key management equipment as part of the migration process.

Discuss Your Removal Options
Responsible Removal of Your Old System

Sustainable Disposal

Legacy equipment is disposed of in accordance with applicable WEEE requirements, with a disposal certificate or report provided for your records.

Flexible Decommissioning

Your new e-Track system can be installed alongside your existing equipment, with removal arranged for a later date when you are ready.

Secure Data Destruction

An approved data destruction method is used to securely erase information stored on the system's single-board computer.

Support as standard

Our involvement does not end once your system is installed. Every e-Track deployment includes a structured handover, ongoing account management and access to our UK-based support team, giving you knowledgeable assistance long after go-live.

headphones_support

Switch to e-Track

View all our case studies